Transmission Cable Tunnel
It is a two cable tunnel built by SP PowerGrid which is about 60m underground consisting of a 16.5km East-West Tunnel and an 18.5km North-South Tunnel across Singapore to accommodate the main transmission cables for efficient installation and maintenance. These cables will serve as a backbone for the nation’s power supply for the coming years.
Clients
SK E & C – Design, Construction and Completion of North-South Transmission Cable Tunnel Contract NS2
Scope of Works:
- Rock blasting using explosives with non-electric detonators
- NoneX Chemical Breaking
- Tunnel fore poling
- Rock bolts
- Shotcrete
- Excavation works
Project Start/End: Aug 2013 – Oct 2015
SK E & C – Design, Construction and Completion of East-West Transmission Cable Tunnel Contract EW2
- Rock blasting using explosives with electronic detonators
- NoneX Chemical Breaking
Project Start/End: Aug 2013 – Oct 2015